Renovation

Our master bedroom / main bathroom renovation, originally estimated as a 4- to 5-week job, actually took about 11 weeks. But now, it’s (basically) done!

And we are happy with the results. This was the starting point for the bathroom:

And this is how it ended up:

Reno_Bathroom

And, OK, we aren’t completely sure about that blue shade for the wall colour, but that’s easy enough to change later. But to take in what happened here:

  • Complete tear-down and replacement of walls and flooring
  • Room made smaller, to accommodate a closet in the bedroom
  • Entrance from the bedroom closed off
  • Separate shower and bathtub combined into one new unit
  • (Toilet is not shown, but it is beside the bathtub)
  • One sink replaced with two
  • New sink cabinet with seven drawers
  • Mirrors above the sink with shelving behind them
  • New countertop, flooring, lighting, tile, and ceiling fan

So generally, despite less square footage, we have more storage space, and all new stuff. The new flooring feels nice under the feet.

As for the bedroom, this where it started (except it normally had furniture in it):

And this is how it ended up:

20180902-untitled-010of010-HDR

Here we are pleased with the paint colours! And with getting the yucky carpet replaced with cork flooring; having a bigger closet; the extra space in general; the cool barn door; and the overhead new light (not pictured but it is installed).

Work by Schweitzer’s Plumbing. Though it did take longer than estimated, they did seem to do a good job on each phase of the project.